Zafaran 85 MW Wind farm (100 GAMESA G52 Turbine)

Zafaran 85 MW Wind farm (100 GAMESA G52 Turbine)

petrotec 026

 Scope of work:

– Erection of 100 GAMESA G52 turbines

Erection   of two meteorological tower 45 m height

– Engineering, supply and erection of permanent power supply for site offices

– Engineering, erection and commissioning of wind farm 220 kv S/S telemetry

– Turbine blade washing and inspection during 3 year warranty period

– Medium voltage grid (100 kiosk include transformer and switchgear and

cable) periodic and corrective maintenance during 3 year warranty  period .

– low voltage cable between generator and ground controller  replacement ( in progress )